Method of running DTS measurements in combination with a back pressure valve

A method of performing a wellbore operation at an oilfield comprises providing a bottom hole assembly comprising a backpressure valve on coiled tubing, deploying the bottom hole assembly into the wellbore with the coiled tubing, operating the backpressure valve to control a flow of fluid thereabove,...

Full description

Saved in:
Bibliographic Details
Main Authors Tunc, Gokturk, Pipchuk, Douglas
Format Patent
LanguageEnglish
Published 28.08.2012
Online AccessGet full text

Cover

Loading…
More Information
Summary:A method of performing a wellbore operation at an oilfield comprises providing a bottom hole assembly comprising a backpressure valve on coiled tubing, deploying the bottom hole assembly into the wellbore with the coiled tubing, operating the backpressure valve to control a flow of fluid thereabove, and performing distributed temperature sensor measurements above the valve.