Synchronization in a Two-supplier Assembly System: Combining a Fixed Lead-time Module with Capacitated Make-to-Order Production
A high-tech manufacturer often produces products that consist of many modules. These modules are either sourced from one of its suppliers or produced in-house. In this paper we study an assembly system in which one module is sourced from a supplier with a fixed lead-time, while the other module is p...
Saved in:
Published in | arXiv.org |
---|---|
Main Authors | , , |
Format | Paper |
Language | English |
Published |
Ithaca
Cornell University Library, arXiv.org
19.05.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | A high-tech manufacturer often produces products that consist of many modules. These modules are either sourced from one of its suppliers or produced in-house. In this paper we study an assembly system in which one module is sourced from a supplier with a fixed lead-time, while the other module is produced by the manufacturer itself in a make-to-order production system. Since unavailability of one of the modules has costly consequences for the production of the end-product, it is important to coordinate between the ordering policy for one module and the production of the other. We propose an order policy for the lead-time module with base-stock levels depending on the number of outstanding orders in the production system of the in-house produced module. We prove monotonicity properties of this policy and show optimality. Furthermore, we conduct a computational experiment to evaluate how the costs of this policy compare to those of a policy with fixed base-stock levels and show that average savings of 17% are attained. |
---|---|
ISSN: | 2331-8422 |