Verification of Mechanical Leaf Gap Error and VMAT Dose Distribution on Varian VitalBeamTM Linear Accelerator
The proper position of a multi-leaf collimator (MLC) is essential for the quality of intensity-modulated radiation therapy (IMRT) and volumetric modulated arc radiotherapy (VMAT) dose delivery. Task Group (TG) 142 provides a quality assurance (QA) procedure for MLC position. Our study investigated t...
Saved in:
Published in | 의학물리, 29(2) pp. 66 - 72 |
---|---|
Main Authors | , , , , |
Format | Journal Article |
Language | English |
Published |
한국의학물리학회
01.06.2018
|
Subjects | |
Online Access | Get full text |
ISSN | 2508-4445 2508-4453 |
DOI | 10.14316/pmp.2018.29.2.66 |
Cover
Loading…
Summary: | The proper position of a multi-leaf collimator (MLC) is essential for the quality of intensity-modulated radiation therapy (IMRT) and volumetric modulated arc radiotherapy (VMAT) dose delivery. Task Group (TG) 142 provides a quality assurance (QA) procedure for MLC position. Our study investigated the QA validation of the mechanical leaf gap measurement and the maintenance procedure. Two VitalBeamTM systems were evaluated to validate the acceptance of an MLC position. The dosimetric leaf gaps (DLGs) were measured for 6 MV, 6 MVFFF, 10 MV, and 15 MV photon beams. A solid water phantom was irradiated using 10×10 cm2 field size at source-to-surface distance (SSD) of 90 cm and depth of 10 cm. The portal dose image prediction (PDIP) calculation was implemented on a treatment planning system (TPS) called EclipseTM. A total of 20 VMAT plans were used to confirm the accuracy of dose distribution measured by an electronic portal imaging device (EPID) and those predicted by VMAT plans. The measured leaf gaps were 0.30 mm and 0.35 mm for VitalBeam 1 and 2, respectively. The DLG values decreased by an average of 6.9% and 5.9% after mechanical MLC adjustment. Although the passing rates increased slightly, by 1.5% (relative) and 1.2% (absolute) in arc 1, the average passing rates were still within the good dose delivery level (>95%). Our study shows the existence of a mechanical leaf gap error caused by a degenerated MLC motor. This can be recovered by reinitialization of MLC position on the machine control panel. Consequently, the QA procedure should be performed regularly to protect the MLC system. KCI Citation Count: 0 |
---|---|
Bibliography: | http://www.progmedphys.org/journal/view.html?uid=824&sort=&scale=&key=year&keyword=&s_v=29&s_n=2&pn=vol&year=2018&vmd=Full |
ISSN: | 2508-4445 2508-4453 |
DOI: | 10.14316/pmp.2018.29.2.66 |