A Study on Using Large-Scale Energy Storage Systems in Automatic Generation Control Operations of the Energy Management Systems
KEPCO has completed the installation and demonstration of a 52 MW battery energy storage system (BESS) for frequency regulation. Especially, 24 MW BESS is for Automatic Generation Control (AGC) in Shin-Yongin substation. Recently, KEPCO Research Institute has operated it connected to EMS of KPX. Thi...
Saved in:
Published in | KEPCO Journal on electric power and energy Vol. 2; no. 1; pp. 121 - 125 |
---|---|
Main Authors | , , , , , |
Format | Journal Article |
Language | Korean |
Published |
2016
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | KEPCO has completed the installation and demonstration of a 52 MW battery energy storage system (BESS) for frequency regulation. Especially, 24 MW BESS is for Automatic Generation Control (AGC) in Shin-Yongin substation. Recently, KEPCO Research Institute has operated it connected to EMS of KPX. This paper discussed the operation strategy of EMS through a study on using 24 MW BESS in AGC operation and propose the improvement of AGC target. It is expected that this paper helps a safe and reliable operation and control of ESS for AGC through its continuous update. |
---|---|
Bibliography: | KISTI1.1003/JNL.JAKO201611962637868 |
ISSN: | 2465-8111 2466-0124 |