DESIGN AND FABRICATION OF THE BEAM POSITION MONITOR FOR THE PEFP LINAC

The beam position monitor (BPM) is an essential component for the PEFP 100-MeV linac's commissioning. A prototype stripline-type linac BPM was designedfor this purpose. The electrode aperture is 20 mm in diameter, and the electrode is 25 mm long, so it can be installed between Drift Tube Linac...

Full description

Saved in:
Bibliographic Details
Published inNuclear engineering and technology Vol. 45; no. 4; pp. 523 - 528
Main Authors Kwon, Hyeok-Jung, Kim, Han-Sung, Seol, Kyung-Tae, Ryu, Jin-Yeong, Jang, Ji-Ho, Cho, Yong-Sub
Format Journal Article
LanguageKorean
Published 2013
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The beam position monitor (BPM) is an essential component for the PEFP 100-MeV linac's commissioning. A prototype stripline-type linac BPM was designedfor this purpose. The electrode aperture is 20 mm in diameter, and the electrode is 25 mm long, so it can be installed between Drift Tube Linac (DTL)101 and DTL102, which is the shortest distance. One end of the electrode is connected to the Sub Miniature Type A (SMA) feed through for signal measurement, and the other end is terminated as a short. The signal amplitude of the fundamental component was calculated and compared with that of the second harmonic component. The designed BPM was fabricated and a low-power RF test was conducted. In this paper, the design, fabrication and low power test of the BPM for the PEFP linac are presented.
Bibliography:KISTI1.1003/JNL.JAKO201325954480873
ISSN:1738-5733
2234-358X