Modeling and Verification of Extended Activated Sludge Model No.1 through Modification

In this paper established a new model by Modified and extended the ASM1 (Activated Sludge Model No.1) model. It was added new items in matrix and added new equations into equation group. The new extended model developed ASM1 by added phosphorus removal function. Validated by BSM1 (Benchmark Simulati...

Full description

Saved in:
Bibliographic Details
Published in2012 2nd International Conference on Remote Sensing, Environment and Transportation Engineering pp. 1 - 4
Main Authors Ping Fang, Ruihua Shao, Dangcong Peng
Format Conference Proceeding
LanguageEnglish
Published IEEE 01.06.2012
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:In this paper established a new model by Modified and extended the ASM1 (Activated Sludge Model No.1) model. It was added new items in matrix and added new equations into equation group. The new extended model developed ASM1 by added phosphorus removal function. Validated by BSM1 (Benchmark Simulation Model No.1) and ASM2 model, results showed that the extended model can apply to wastewater treatment plant more easily.
ISBN:1467308722
9781467308724
DOI:10.1109/RSETE.2012.6260628