Study on hazard source evaluation in construction sites with modified LEC method

LEC method is suit for all kinds of working conditions for it being simple and convenient. But the credibility of evaluation conclusion by LEC is low because the method is affected by subjective factors easily and is difficult to assign. In the paper, the LEC method is modified and improved after C...

Full description

Saved in:
Bibliographic Details
Published in2011 Second International Conference on Mechanic Automation and Control Engineering pp. 3508 - 3510
Main Authors Yang Can-sheng, Liu Hui, Huang Guo-zhong, Wu Zhong-guang
Format Conference Proceeding
LanguageEnglish
Published IEEE 01.07.2011
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:LEC method is suit for all kinds of working conditions for it being simple and convenient. But the credibility of evaluation conclusion by LEC is low because the method is affected by subjective factors easily and is difficult to assign. In the paper, the LEC method is modified and improved after C is decided into five factors based on the composition of accident lose in construction sites and factors are given weights. The example application shows that the evaluation conclusion with modified LEC method coincides with the actual situation, so it can be used to evaluate the hazard source in construction sites.
ISBN:9781424494361
1424494362
DOI:10.1109/MACE.2011.5987748