Scheduling of Post-Flood Recovery Project with Flexible Project Structure
Flood events around the world result in the loss of human lives, disruption, damage to economic, infrastructural and ecological systems. Although, different frameworks to manage flood events exist; however, the complexity (i.e. adjustment and adaptation) associated with some of these approaches is o...
Saved in:
Published in | Journal of Engineering, Project, and Production Management Vol. 11; no. 2; pp. 118 - 126 |
---|---|
Main Authors | , |
Format | Journal Article |
Language | Chinese |
Published |
其他
De Gruyter
01.05.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Flood events around the world result in the loss of human lives, disruption, damage to economic, infrastructural and ecological systems. Although, different frameworks to manage flood events exist; however, the complexity (i.e. adjustment and adaptation) associated with some of these approaches is often limited by constraints of time and resources. Therefore, this study attempts to apply a flexible project structure to schedule a post-flood recovery project (PFRP). Twenty-five (25) restorative activities in a PFRP were identified, categorised and scheduled as resource-constrained project scheduling problem with a flexible structure (RCPSP-FS). Monte Carlo simulation was used to reflect the uncertain characteristics of each restorative activity. PFRP completion time was 42 and 86 days under time and resource constraints assumptions, respectively. Thirty- four (34) network paths (sub-projects) were identified and grouped into 4 restorative measures as follows: (i) removal of hazardous materials (ii) evacuation |
---|---|
ISSN: | 2221-6529 |