GAS TURBINE CLEARANCE CONTROL SYSTEM

In a gas turbine clearance control system according to the present invention, a control device operates a regulating device such that a first flow rate becomes greater than a second flow rate if in a stable load state in which the fluctuation margin of a load changes within a preset range, and opera...

Full description

Saved in:
Bibliographic Details
Main Authors HADA, Satoshi, FUKUNAGA, Yuya, WAKAZONO, Susumu
Format Patent
LanguageEnglish
French
Japanese
Published 17.03.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:In a gas turbine clearance control system according to the present invention, a control device operates a regulating device such that a first flow rate becomes greater than a second flow rate if in a stable load state in which the fluctuation margin of a load changes within a preset range, and operates the regulating device such that the second flow rate becomes greater than the first flow rate if in a fluctuating load state in which the load is out of range. La présente invention concerne un système de commande de dégagement de turbine à gaz dans lequel un dispositif de commande actionne un dispositif de régulation de telle sorte qu'un premier débit devient supérieur à un second débit s'il est dans un état de charge stable dans lequel la marge de fluctuation d'une charge change dans une plage prédéfinie et actionne le dispositif de régulation de telle sorte que le second débit devient supérieur au premier débit s'il est dans un état de charge fluctuante dans lequel la charge est hors de la plage. ガスタービンのクリアランス制御システムにおいて、制御装置は、負荷の変動幅が予め設定された範囲内で推移する負荷安定状態となった場合に、第1流量が第2流量よりも大きくなるように調節装置を作動させ、負荷が範囲外となる負荷変動状態となった場合に、第2流量が第1流量よりも大きくなるように調節装置を作動させる。
Bibliography:Application Number: WO2021JP32762