SYSTEM AND METHOD TO INCREASE PRODUCTION FROM A BOREHOLE

A borehole system including a completion in a borehole; an interval of the borehole having a plurality of productivity zones therein, at least one of the zones being a lower productivity zone and at least one of the zones being a higher productivity zone; a pump connected to the at least one lower p...

Full description

Saved in:
Bibliographic Details
Main Authors ABDELFATTAH, Tarik, GONZALEZ, Jose Rafael
Format Patent
LanguageEnglish
French
Published 20.02.2020
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:A borehole system including a completion in a borehole; an interval of the borehole having a plurality of productivity zones therein, at least one of the zones being a lower productivity zone and at least one of the zones being a higher productivity zone; a pump connected to the at least one lower productivity zone of the interval and configured to bring production from the lower productivity zone to a production capacity of the higher productivity zone of the interval. L'invention concerne un système de trou de forage comprenant une complétion dans un trou de forage ; un intervalle du trou de forage ayant une pluralité de zones de productivité à l'intérieur de celui-ci, au moins l'une des zones étant une zone de productivité inférieure et au moins l'une des zones étant une zone de productivité supérieure ; une pompe raccordée à l'au moins une zone de productivité inférieure de l'intervalle et conçue pour amener la production de la zone de productivité inférieure à une capacité de production de la zone de productivité supérieure de l'intervalle.
Bibliography:Application Number: WO2019US41307