Real-time scheduling of virtual machines

A method for scheduling a plurality of virtual machines includes: determining a resource requirement (Xi) for each virtual machine (VM); determining an interrupt period (Yi) for each VM; and scheduling the plurality of VMs based, at least in part, on each respective Xi and Yi.

Saved in:
Bibliographic Details
Main Authors COTA-ROBLES ERIK C, FLAUTNER KRISZTIAN
Format Patent
LanguageEnglish
Published 08.04.2008
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:A method for scheduling a plurality of virtual machines includes: determining a resource requirement (Xi) for each virtual machine (VM); determining an interrupt period (Yi) for each VM; and scheduling the plurality of VMs based, at least in part, on each respective Xi and Yi.
Bibliography:Application Number: US20000541444