RESOURCE MANAGEMENT USING FLEXIBLY-SCHEDULED PROCESSING
Methods and systems for controlling computing processes to manage finite resources are described. In an aspect, a method may include obtaining resource availability data indicating current resource availability for a resource associated with the computing system. The method may further include detec...
Saved in:
Main Authors | , , , , , |
---|---|
Format | Patent |
Language | English |
Published |
17.10.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Methods and systems for controlling computing processes to manage finite resources are described. In an aspect, a method may include obtaining resource availability data indicating current resource availability for a resource associated with the computing system. The method may further include detecting an excess availability of a resource of a particular type based on the resource availability data. The method may further include, in response to detecting the excess availability of the resource of the particular type, identify a flexibly-scheduled computing process requiring the use of the resource of the particular type. The method may further include initiating the flexibly-scheduled computing process to consume at least a portion of the excess availability of the resource. |
---|---|
Bibliography: | Application Number: US202318298632 |