BUILDING MANAGEMENT SYSTEM WITH CONTROL FRAMEWORK

Systems and methods for automatically commissioning and operating a heating, ventilation, or air conditioning (HVAC) system for a building site are provided. An exemplary method includes constructing a model using physical equipment of the HVAC system and relationships between the physical equipment...

Full description

Saved in:
Bibliographic Details
Main Authors Przybylski, Andrew J, Burroughs, John H, Wenzel, Michael J
Format Patent
LanguageEnglish
Published 16.06.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Systems and methods for automatically commissioning and operating a heating, ventilation, or air conditioning (HVAC) system for a building site are provided. An exemplary method includes constructing a model using physical equipment of the HVAC system and relationships between the physical equipment. The model indicates connections between the physical equipment and one or more resources produced or consumed by the physical equipment. The method includes generating a mapping between points of the physical equipment at the building site and corresponding variables of the model, using the model to generate values of one or more control variables of the model, and operating the physical equipment by providing the values of the control variables to corresponding points of the physical equipment based on the mapping.
Bibliography:Application Number: US202217689569