METHOD FOR CHECKING THE MAXIMUM AVAILABLE POWER OF A TURBINE ENGINE OF AN AIRCRAFT EQUIPPED WITH TWO TURBINE ENGINES

A method for checking the maximum available power of a turbine engine of an aircraft equipped with two turbine engines configured to operate in parallel and together to supply a necessary power to the aircraft during a flight phase includes: placing one of the turbine engines in a maximum take-off p...

Full description

Saved in:
Bibliographic Details
Main Authors SEVE, Caroline, DARFEUIL, Pierre, MARCONI, Patrick
Format Patent
LanguageEnglish
Published 15.04.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:A method for checking the maximum available power of a turbine engine of an aircraft equipped with two turbine engines configured to operate in parallel and together to supply a necessary power to the aircraft during a flight phase includes: placing one of the turbine engines in a maximum take-off power regime, and adjusting a power supplied by the other turbine engine, such that the turbine engines continue to supply the necessary power to the aircraft during the flight phase; determining a power supplied by the turbine engine placed in the maximum take-off power regime, and processing the supplied power determined in this way, in order to deduce a piece of information relating to the maximum available power.
Bibliography:Application Number: US201816500285