Coordinated Production and Transportation Scheduling Method and System Based on Improved Tabu Search Algorithm
The present invention discloses a coordinated production and transportation scheduling method and system based on an improved tabu search algorithm, and a storage medium. The method includes batching jobs, initializing algorithm parameters, generating an initial solution, generating a neighborhood s...
Saved in:
Main Authors | , , , , , , |
---|---|
Format | Patent |
Language | English |
Published |
14.03.2019
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The present invention discloses a coordinated production and transportation scheduling method and system based on an improved tabu search algorithm, and a storage medium. The method includes batching jobs, initializing algorithm parameters, generating an initial solution, generating a neighborhood solution set, performing mutation, crossover and selection on individuals, determining a candidate solution set; calculating a fitness value of an individual, updating the candidate solution set; updating a tabu list, and determining whether an algorithm termination condition is satisfied; if yes, outputting the global optimal solution; otherwise, returning to the step 4. The present invention is mainly aimed at the coordinated production and transportation batch scheduling problem with multiple manufacturers. The whole profit of an enterprise in the production and transportation phases can be maximized, and high quality services can be provided for customers of the enterprise with improved core competitiveness of the enterprise. |
---|---|
Bibliography: | Application Number: US201816127350 |