ADDING AND SHEDDING LOADS USING LOAD LEVELS TO DETERMINE TIMING
Some embodiments relate to a method of adding and shedding loads that are connected to a generator. The method includes determining whether a plurality of loads is being supplied with power by the generator and then determining the total load that the generator is supplying to the plurality of loads...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | English |
Published |
13.09.2018
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Some embodiments relate to a method of adding and shedding loads that are connected to a generator. The method includes determining whether a plurality of loads is being supplied with power by the generator and then determining the total load that the generator is supplying to the plurality of loads. The method further includes determining whether to change a number of the loads in the plurality of loads based on the amount of load L that is being supplied by the generator. The method further includes determining an amount of time T in which to change the number of loads in the plurality of loads based on the amount of load that is being supplied by the generator. |
---|---|
Bibliography: | Application Number: US201815977854 |