INTRA-VEHICLE CHARGING SYSTEM FOR USE IN RECHARGING VEHICLES EQUIPPED WITH ELECTRICALLY POWERED PROPULSION SYSTEMS
The E-Grid Sub-Network Load Manager operates to regulate the demands presented by vehicles to the associated Sub-Network thereby to spread the load presented to the service disconnect over time to enable controllable charging of a large number of vehicles. Load management can be implemented by a num...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | English |
Published |
10.06.2010
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The E-Grid Sub-Network Load Manager operates to regulate the demands presented by vehicles to the associated Sub-Network thereby to spread the load presented to the service disconnect over time to enable controllable charging of a large number of vehicles. Load management can be implemented by a number of methodologies, including: queuing requests and serving each request in sequence until satisfaction; queuing requests and cycling through the requests, partially serving each one, then proceeding to the next until the cyclic partial charging service has satisfied all of the requests; ordering requests pursuant to a percentage of recharge required measurement; ordering requests on an estimated connection time metric; ordering requests on a predetermined level of service basis; and the like. It is evident that a number of these methods can be concurrently employed thereby to serve all of the vehicles in the most efficient manner that can be determined. |
---|---|
Bibliography: | Application Number: US20090436450 |