METHOD AND APPARATUS FOR FORMATION EVALUATION AFTER DRILLING
Methods and apparatus for evaluating a formation include conveying a formation evaluation tool in a borehole on a tubular carrier extending from a surface location at least to the formation evaluation tool. A cable is conveyed to the formation evaluation tool and communication between the formation...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | English |
Published |
18.03.2010
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Methods and apparatus for evaluating a formation include conveying a formation evaluation tool in a borehole on a tubular carrier extending from a surface location at least to the formation evaluation tool. A cable is conveyed to the formation evaluation tool and communication between the formation evaluation tool and the cable is established after the formation evaluation tool is moved to a selected borehole location. |
---|---|
Bibliography: | Application Number: US20080212777 |