Coal uncovering construction method for blasting large cross-section gas tunnels
A coal uncovering construction method for blasting large cross-section gas tunnels includes: analyzing stress distribution characteristics in front of a tunnel boring working face, and then determining a thickness calculation model of a reserved rock wall based on a limit equilibrium theory; establi...
Saved in:
Main Authors | , , , , , , , , , , |
---|---|
Format | Patent |
Language | English |
Published |
02.07.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | A coal uncovering construction method for blasting large cross-section gas tunnels includes: analyzing stress distribution characteristics in front of a tunnel boring working face, and then determining a thickness calculation model of a reserved rock wall based on a limit equilibrium theory; establishing a tunnel model, simulating a construction condition and analyzing a construction result, and determining a thickness of the reserved rock wall; and fixing a detonator through a fixed sand ring, fitting the detonator with a construction hole by adjusting an adjustable protective plate, then embedding the detonator into a blast hole, and blasting the detonator for tunnel construction. Furthermore, an extension ring is fixed between the fixed sand ring and the adjustable protective plate. |
---|---|
Bibliography: | Application Number: US202318224720 |