Detecting misprediction when an additional branch direction prediction determined using value prediction is considered more accurate than an initial branch direction prediction

An apparatus has processing circuitry for executing instructions and fetch circuitry for fetching the instructions for execution. When a branch instruction is encountered by the fetch circuitry, it determines subsequent instructions to be fetched in dependence on an initial branch direction predicti...

Full description

Saved in:
Bibliographic Details
Main Authors Bull, David Michael, Vasekin, Vladimir, Piry, Frederic Claude Marie, Fedorov, Alexei
Format Patent
LanguageEnglish
Published 02.08.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:An apparatus has processing circuitry for executing instructions and fetch circuitry for fetching the instructions for execution. When a branch instruction is encountered by the fetch circuitry, it determines subsequent instructions to be fetched in dependence on an initial branch direction prediction for the branch instruction made by branch prediction circuitry. Value prediction circuitry is used to maintain a predicted result value for one or more instructions, and dispatch circuitry maintains a record of pending instructions that have been fetched by the fetch circuitry and are awaiting execution by the processing circuitry, and selects pending instructions from the record for dispatch to the processing circuitry. When a given instruction whose predicted result value is maintained by the value prediction circuitry has a dependent instruction whose outcome is dependent on a result value of the given instruction, the dispatch circuitry nay be arranged to enable speculative execution of that dependent instruction using the predicted result value of the given instruction. Analysis circuitry is arranged, when the dependent instruction is the branch instruction, to detect a mispredict condition when an additional branch direction prediction for the branch instruction determined using the predicted result value for the given instruction is considered more accurate that the initial branch direction prediction, and the additional branch direction prediction differs to the initial branch direction prediction. On detection of the mispredict condition, a control signal is issued to indicate that the branch instruction has been mispredicted.
Bibliography:Application Number: US202117158276