Tie-in of subsea pipeline
A method of installing a header pipe joint at a subsea structure is provided, comprising providing a header pipe joint having at least one valve installed therein and connecting the header pipe joint inline of a spool or pipeline prior to lowering the header pipe joint to the subsea structure. The h...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | English |
Published |
22.06.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | A method of installing a header pipe joint at a subsea structure is provided, comprising providing a header pipe joint having at least one valve installed therein and connecting the header pipe joint inline of a spool or pipeline prior to lowering the header pipe joint to the subsea structure. The header pipe joint is then lowered to the subsea structure, and the valve is connected to the subsea structure (e.g. a subsea production system of the subsea structure such as a xmas tree) with a connection bridge e.g. a choke bridge. This provides a fluidic connection between the subsea structure and the header pipe joint. The subsea structure comprises a foundation, e.g. suction anchors, which provide support for both a wellhead and the header pipe joint. A subsea assembly comprising a subsea structure, header pipe joint and connection bridge is also provided. |
---|---|
Bibliography: | Application Number: US201716470063 |