Method of treating a well with the formation of proppant structures (variants)

The essence of the method is to inject a proppant-bearing gel into the wellbore drilled into a productive formation. The low-viscosity fracturing fluid is injected into the wellbore together with the gel fluid (simultaneously or in turns). The method also provides for the injection of gas into the p...

Full description

Saved in:
Bibliographic Details
Main Authors Yutkin, Maxim Pavlovich, Yakovlev, Andrey Vladimirovich, Panga, Mohan Kanaka Raju, Yudina, Kira Vladimirovna, Lungwitz, Bernhard Rudolf, Alekseev, Alexey Vladimirovich, Skiba, Sergey Sergeevich, Kraemer, Chad, Horvath Szabo, Geza, Vidma, Konstantin Viktorovich
Format Patent
LanguageEnglish
Published 24.09.2019
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The essence of the method is to inject a proppant-bearing gel into the wellbore drilled into a productive formation. The low-viscosity fracturing fluid is injected into the wellbore together with the gel fluid (simultaneously or in turns). The method also provides for the injection of gas into the proppant-bearing gel and/or the low-viscosity fluid. The gas can be injected upstream of the junction point, at the junction point, or downstream of the junction point of the flows of the proppant-bearing gel and the low-viscosity fluid. The method further provides for the division of the gel fluid into the separate agglomerates with their subsequent injection into the fractures in the subterranean formation to form the proppant structures in the fracture.
Bibliography:Application Number: US201515780152