TESTING PROCESS FOR ZERO EMISSION HYDROCARBON WELLS
Testing process for testing zero emission hydrocarbon wells in order to obtain general information on a reservoir, comprising the following steps: injecting into the reservoir a suitable liquid or gaseous fluid, compatible with the hydrocarbons of the reservoir and with the formation rock, at a cons...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | English |
Published |
14.04.2010
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | Testing process for testing zero emission hydrocarbon wells in order to obtain general information on a reservoir, comprising the following steps: injecting into the reservoir a suitable liquid or gaseous fluid, compatible with the hydrocarbons of the reservoir and with the formation rock, at a constant flow-rate or with constant flow rate steps, and substantially measuring, in continuous, the flow-rate and injection pressure at the well bottom; closing the well and measuring the pressure, during the fall-off period (pressure fall-off) and possibly the temperature; interpreting the fall -off data measured in order to evaluate the average static pressure of the fluids (pav) and the reservoir properties: actual permeability (k), transmissivity (kh), areal heterogeneity or permeability barriers and real Skin factor (S); calculating the well productivity. |
---|---|
Bibliography: | Application Number: TN2008SN00466 |