FIELD: oil and gas industry.SUBSTANCE: at an oil deposit development oil is extracted through production wells and water is injected through injection wells in a cyclic mode. The cyclic mode is performed at individual injection wells fed with water from a group pumping station. At the remaining inje...

Full description

Saved in:
Bibliographic Details
Main Authors ZABBAROV RUSLAN GABDELRAKIBOVICH, GANIEV BULAT GALIEVICH, GRABOVETSKIJ DMITRIJ SERGEEVICH, KHISAMOV RAIS SALIKHOVICH, AFLJATUNOV RINAT RAKIPOVICH, DAMINOV ARSLAN MIRGAJAZOVICH
Format Patent
LanguageEnglish
Russian
Published 10.03.2015
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:FIELD: oil and gas industry.SUBSTANCE: at an oil deposit development oil is extracted through production wells and water is injected through injection wells in a cyclic mode. The cyclic mode is performed at individual injection wells fed with water from a group pumping station. At the remaining injection wells the permanent injection pressure is maintained. In the cyclic mode periodical limitation of water injection is set for the individual injection wells by complete or partial cut-off of a headrace with respective limitation of the injected water. Pumps of the group pumping station are set to the mode of the permanent pressure maintenance at the station output. An electric drive of the pumps is made partially regulated. At that a non-linear reversed algorithm is used for frequency regulation of the pumps electric current depending on the pressure at the output of the group pumping station. When the consumption rate of a working agent is reduced and the pressure is increased in the pump flow line the frequency of the electric pump feeding current is reduced as per a non-linear dependence till the preset pressure is obtained at a flow line of the group pumping station. When the consumption rate of the working agent is increased and the pressure is decreased in the pump flow line the frequency of the electric pump feeding current is increased till the preset pressure is obtained at the flow line of the group pumping station. The duration of the headrace cut-off is defined as the time required for the stoppage of the fluid flows movement in in-situ conditions within limits of the injection well impact. The duration of the complete or partial cut-off of the headrace is an assigned period of at least 2 hours and less than 4 hours per day. The complete or partial cut-off of the headrace is assigned with consideration of the time for control of the electric network power.EFFECT: improved efficiency of the method due to the ensured optimal mode of water injection at water flooding and reduction of costs for oil production.1 ex Изобретение относится к нефтяной промышленности и может найти применение при разработке нефтяной залежи. Технический результат - повышение эффективности способа за счет обеспечения оптимального режима закачки воды при заводнении и снижения расходов на добычу нефти. При разработке нефтяной залежи ведут отбор нефти через добывающие скважины и закачку воды через нагнетательные скважины в циклическом режиме. Циклический режим выполняют на отдельных нагнетательных скважинах, снабжаемых водой от кустовой насосной станции. На остальных нагнетательных скважинах поддерживают постоянное давление закачки. При циклическом режиме производят периодическое ограничение закачки воды на отдельных нагнетательных скважинах полным или частичным перекрытием подводящего водовода с соответствующим ограничением расхода закачиваемой воды. Насосы на кустовой насосной станции настраивают на режим поддержания постоянного давления на выходе кустовой насосной станции. Электропривод насосов выполняют частотно регулируемым. При этом применяют нелинейный обратный алгоритм регулирования частоты электрического тока электропривода насосов в зависимости от давления на выходе кустовой насосной станции. При уменьшении расхода рабочего агента и увеличении давления в выкидной линии насоса частоту питающего тока электронасоса уменьшают по нелинейной зависимости до заданного значения давления в выкидной линии кустовой насосной станции. При увеличении расхода рабочего агента и соответствующем снижении давления в выкидной линии насоса частоту питающего тока увеличивают до достижения заданного значения давления в выкидной
Bibliography:Application Number: RU20140120498