INJECTION WELL REPAIR METHOD

FIELD: oil production, particularly methods or devices for cementing, for plugging holes, crevices, or the like. ^ SUBSTANCE: method involves creating sand bridge within perforation interval. Sand with 0.6-0.8 mm particle dimensions is used and sand bridge is installed up to level spaced at least 1....

Full description

Saved in:
Bibliographic Details
Main Authors TABASHNIKOV ROMAN ALEKSEEVICH, ZAKIROV AJRAT FIKUSOVICH, IBRAGIMOV NAIL' GABDULBARIEVICH, NIKITIN VASILIJ NIKOLAEVICH, TAZIEV MIRGAZIJAN ZAKIEVICH
Format Patent
LanguageEnglish
Russian
Published 27.04.2008
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:FIELD: oil production, particularly methods or devices for cementing, for plugging holes, crevices, or the like. ^ SUBSTANCE: method involves creating sand bridge within perforation interval. Sand with 0.6-0.8 mm particle dimensions is used and sand bridge is installed up to level spaced at least 1.5 m over perforation interval. Sand is supplied via production string having lower end arranged in well and spaced 30-35 cm over upper level of sand bridge to be created. Then liquid circulation with flow rate of 1.5-2.0 dm3/s via production string is provided. After that sand in amount of 45-55 kg/m3 is poured in production string. Liquid circulation rate is increased to 2.8-3.4 dm3/s along with sand amount increase up to 90-110 kg/m3 for production strings having diameters of 2.5" and up to 140-160 kg/m3 for production strings of 3" diameters. After calculated amount of sand pouring liquid with volume of not less than one production string volume is injected and technological time-delay is carried out for not less than 4 hours to provide sand subsidence. After than liquid circulation in well is recommenced. Finally upper level of sand bridge is determined. ^ EFFECT: increased reliability of perforation interval isolation during remedial cementing. ^ 1 cl, 1 ex
Bibliography:Application Number: RU20070119000