METHOD FOR UNDERGROUND TUNNEL RESERVOIR BUILDING IN ROCK SALT BED HAVING LIMITED THICKNESS

FIELD: transport and storage devices, particularly for building underground reservoirs. ^ SUBSTANCE: method involves placing adjusting pipe string bottom of directionally drilled well in horizontal position at well outlet; arranging preparation underground excavation for design tunnel reservoir heig...

Full description

Saved in:
Bibliographic Details
Main Authors IGOSHIN A.I, LEBEDINSKIJ V.S, KHAN S.A, JAKOVLEV N.M, GORIF'JANOV V.I, SMIRNOV V.I, LITVINOV S.A, KHRULEV A.S, SALOKHIN V.I, BORISOV V.V, VASILENKO V.V
Format Patent
LanguageEnglish
Russian
Published 20.08.2005
Edition7
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:FIELD: transport and storage devices, particularly for building underground reservoirs. ^ SUBSTANCE: method involves placing adjusting pipe string bottom of directionally drilled well in horizontal position at well outlet; arranging preparation underground excavation for design tunnel reservoir height at initial stage of rock solution between casing and adjusting pipe strings of directionally drilled well; ejecting non-solvent in casing pipe strings along with maintaining non-solvent-brine interface in upper part of preparation excavation or in the case of stepped rock solving at level of each underground tunnel reservoir stage forming; maintaining non-solvent-brine interface in vertical well at level or above level of non-solvent-brine interface of preparation excavation. ^ EFFECT: increased efficiency of underground tunnel building. ^ 6 dwg
Bibliography:Application Number: RU20040104428