METHOD OF ACCOMPLISHING LAYOUT WORK

construction geodesy; construction and industrial engineering. SUBSTANCE: position of specific points of structure to be built are by their coordinates by means by means of electronic tachometer without plotting the lines and relative to coordinates of datum point. Datum point coordinates are determ...

Full description

Saved in:
Bibliographic Details
Main Authors JUSUPOV N.S, KHAKIMULLIN N.M, SAMITOV R.A
Format Patent
LanguageEnglish
Published 10.12.2001
Edition7
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:construction geodesy; construction and industrial engineering. SUBSTANCE: position of specific points of structure to be built are by their coordinates by means by means of electronic tachometer without plotting the lines and relative to coordinates of datum point. Datum point coordinates are determined by laying out theodolite traverse from datum point with known coordinates which is nearest to construction area. EFFECT: enhanced reliability of geodetic measurements; enhanced accuracy at all stages of construction and erection jobs. 3 dwg
Bibliography:Application Number: RU20000110513