METHOD OF ACCOMPLISHING LAYOUT WORK
construction geodesy; construction and industrial engineering. SUBSTANCE: position of specific points of structure to be built are by their coordinates by means by means of electronic tachometer without plotting the lines and relative to coordinates of datum point. Datum point coordinates are determ...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | English |
Published |
10.12.2001
|
Edition | 7 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | construction geodesy; construction and industrial engineering. SUBSTANCE: position of specific points of structure to be built are by their coordinates by means by means of electronic tachometer without plotting the lines and relative to coordinates of datum point. Datum point coordinates are determined by laying out theodolite traverse from datum point with known coordinates which is nearest to construction area. EFFECT: enhanced reliability of geodetic measurements; enhanced accuracy at all stages of construction and erection jobs. 3 dwg |
---|---|
Bibliography: | Application Number: RU20000110513 |