METHOD OF DETERMINING OPTIMAL PRODUCTION RATE OF PRODUCING GAS-CONDENSATE WELL
development of gas-condensate deposits. SUBSTANCE: method includes hydrodynamic researches at different steady operating conditions of well; determination of production rate of gas, condensate and water by separation plant; calculation of production rate of mixture of gas, condensate and water under...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | English |
Published |
10.08.2000
|
Edition | 7 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | development of gas-condensate deposits. SUBSTANCE: method includes hydrodynamic researches at different steady operating conditions of well; determination of production rate of gas, condensate and water by separation plant; calculation of production rate of mixture of gas, condensate and water under operating conditions in middle of tubing; construction of line of condensate production rate; construction of stable condensate production rate versus gas, condensate and water mixture production rate graph. Value of optimal production rate of well is determined by point of break of curve of given relationship lying on line of potential production rate. EFFECT: prolonged term of pool development at energy-saving regime to obtain additional condensate from pool. 3 cl, 2 dwg, 1 tbl, 1 ex |
---|---|
Bibliography: | Application Number: RU19980121244 |