FREMGANGSMAATE VED OG ANORDNING FOR FORBINDELSE AV EN UNDERVANNSLEDNING FOR STROEMMENDE MEDIUM MED EN UT FRA LAND ANBRAGT KONSTRUKSJON

A method for connecting an underwater flowline having a substantial portion thereof lying along the floor of a body of water to an offshore platform structure positioned on the floor. One of the natural sag lines of the flowline is determined and a plurality of flowline clamps (with locks) are insta...

Full description

Saved in:
Bibliographic Details
Main Authors VISSER, ROBERT CORNELIS, LANGNER, CARL GOTTLIEB
Format Patent
LanguageNorwegian
Published 06.12.1978
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:A method for connecting an underwater flowline having a substantial portion thereof lying along the floor of a body of water to an offshore platform structure positioned on the floor. One of the natural sag lines of the flowline is determined and a plurality of flowline clamps (with locks) are installed on the platform structure substantially conforming to the predetermined natural sag line in such a manner that a line drawn through the locks assumes a shape related to substantially the predetermined natural sag line. The flowline is pulled into engagement with the locks and secured thereto.
Bibliography:Application Number: NO19720000317