METHOD AND SYSTEM OF SAND MANAGEMENT
A TECHNIQUE FACILITATES SAND CONTROL IN A WELLBORE (24). A LOWER COMPLETION (20) AND AN UPPER COMPLETION (76) ARE RUN DOWNHOLE INTO THE WELLBORE (24) AND DEPLOYED. THE LOWER COMPLETION ASSEMBLY (20) EMPLOYS A PLURALITY OF PACKERS TO ISOLATE WELL ZONES (30). THE LOWER COMPLETION ASSEMBLY (20) ALSO HA...
Saved in:
Main Authors | , , , , , |
---|---|
Format | Patent |
Language | English |
Published |
31.05.2017
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | A TECHNIQUE FACILITATES SAND CONTROL IN A WELLBORE (24). A LOWER COMPLETION (20) AND AN UPPER COMPLETION (76) ARE RUN DOWNHOLE INTO THE WELLBORE (24) AND DEPLOYED. THE LOWER COMPLETION ASSEMBLY (20) EMPLOYS A PLURALITY OF PACKERS TO ISOLATE WELL ZONES (30). THE LOWER COMPLETION ASSEMBLY (20) ALSO HAS GRAVEL PACK PORTS (56) WHICH ARE INDEPENDENTLY OPENED TO ENABLE GRAVEL PACKING OF EACH INDIVIDUAL ZONE VIA A TOOL RUN DOWNHOLE. ADDITIONALLY, THE LOWER COMPLETION (20) ASSEMBLY HAS A PRODUCTION PORT (52) IN EACH ZONE. A SHIFTING TOOL (102) IS EMPLOYED TO OPEN THE PRODUCTION PORTS (52) AND TO ENABLE PRODUCTION FROM THE WELL ZONES (30). |
---|---|
Bibliography: | Application Number: MY2011PI05686 |