IoT Data Collection Method for Data Center Energy Consumption Diagnosis using IoT Visual Intelligence

The present invention provides a method capable of measuring, collecting and calculating power of a data center without complex construction by using an IoT-based watt-hour meter. According to embodiments of the present invention, the data center consumption power diagnosis method comprises: a step...

Full description

Saved in:
Bibliographic Details
Main Authors KANG JEONG HOON, JUNG HYE DONG
Format Patent
LanguageEnglish
Korean
Published 17.06.2019
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The present invention provides a method capable of measuring, collecting and calculating power of a data center without complex construction by using an IoT-based watt-hour meter. According to embodiments of the present invention, the data center consumption power diagnosis method comprises: a step where a first IoT device photographs a first watt-hour meter for displaying wattage consumed by servers; a first recognition step where the first IoT device recognizes first wattage indicated in a photographed first watt-hour meter image; a step where a second IoT device photographs a second watt-hour meter for displaying wattage consumed by thermohygrostats; a second recognition step where the second IoT device recognizes second wattage indicated in a photographed second watt-hour meter image; and a step where the first IoT device calculates power usage effectiveness (PUE) based on the first wattage and the second wattage. Accordingly, desired PUE can be calculated by a convenient method without complex construction, and can be immediately checked at a site. IoT 기반의 전력량계를 이용하여, 복잡한 공사 없이 데이터 센터의 전력을 측정, 수집, 계산할 수 있는 방법이 제공된다. 본 발명의 실시예에 따른 데이터 센터 소비전력 진단 방법은 제1 IoT 디바이스가, 서버들이 소모하는 전력량을 표시하는 제1 전력량계를 촬영하는 단계; 제1 IoT 디바이스가, 촬영된 제1 전력량계 영상에 나타난 제1 전력량을 인식하는 제1 인식단계; 제2 IoT 디바이스가, 항온항습기들이 소모하는 전력량을 표시하는 제2 전력량계를 촬영하는 단계; 제2 IoT 디바이스가, 촬영된 제2 전력량계 영상에 나타난 제2 전력량을 인식하는 제2 인식단계; 제1 IoT 디바이스가, 제1 전력량 및 제2 전력량을 기초로, PUE(Power Usage Effectiveness)를 산출하는 단계;를 포함한다. 이에 의해, 복잡한 공사 없이 보다 간편한 방법으로 원하는 PUE를 계산할 수 있게 되고, 현장에서 바로 확인까지 가능하게 된다.
Bibliography:Application Number: KR20170167312