PC Top-down method using precast-concrete colum

The present invention relates to a PC top-down method using a square steel pipe and a composite precast concrete column. According to the present invention, a PC column where precast concrete is formed with a predetermined thickness outside a square steel pipe having an inner hollow portion is used...

Full description

Saved in:
Bibliographic Details
Main Authors PARK, HONG GUN, PARK, KWAN SOO, CHO, JUNG POM, KIM, HAN JONG, MOON, JAE KYUNG, OH, SE YOON, LEE, HO JUN, HONG, SUNG YUB, OH, JONG PYO, PARK, SUNG SOON, YOON, HEE JUN, SHIM, JI TAEK, KWON, SOON YOUNG, BAE, JIN MO
Format Patent
LanguageEnglish
Korean
Published 06.03.2019
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The present invention relates to a PC top-down method using a square steel pipe and a composite precast concrete column. According to the present invention, a PC column where precast concrete is formed with a predetermined thickness outside a square steel pipe having an inner hollow portion is used as a king post so that excavation and underground structure construction are possible with a slurry wall support by means of a deck slab system on a steel beam and a PC slab system on a PC beam, forward and reverse column installation processes can be omitted, and thus construction period reduction can be achieved to a significant extent. A preferred embodiment of the present invention includes (a) installing the slurry wall down to a predetermined depth; (b) positioning a column mounting hole at a predetermined depth; (c) inserting and installing a PC column having a predetermined thickness of precast concrete on the outside of the square steel pipe having a hollow portion formed therein into the column mounting hole; (d) placing concrete into the square steel pipe of the PC column to form a temporary foundation from a lower end of the column installation hole to a certain height; (e) installing a beam and a slab on the slurry wall and the PC column to form a single-layer bottom plate structure; and (f) performing construction up to the bottom surface of the foundation by repeating the step of filling concrete into the square steel pipe and conducting upper frame construction on the ground floor and forming the bottom plate by excavating the underground floor to a predetermined depth and installing the beam and the slab in the slurry wall and the column. 본 발명은 내부에 중공부가 형성된 각형강관의 외부에 일정 두께로 프리캐스트 콘크리트가 형성되는 PC 기둥을 킹포스트로 활용하여 철골 보에 데크 슬래브 시스템 및 PC보에 PC 슬래브 시스템 등으로 슬러리월을 지지하며 굴착 및 지하구조물 건설이 가능하며, 순타 및 역타의 기둥 설치 공정을 생략할 수 있어 획기적으로 공기단축이 가능한 각형강관과 합성된 프리캐스트 콘크리트 기둥을 활용한 PC 탑다운공법에 관한 것이다. 본 발명의 바람직한 일 실시예는 (a) 슬러리월을 소정의 깊이까지 내려 설치하는 단계; (b) 일정 깊이로 기둥 설치용 홀을 시굴하는 단계; (c) 내부에 중공부가 형성된 각형강관의 외부에 일정 두께로 프리캐스트 콘크리트가 형성되는 PC 기둥을 기둥 설치용 홀에 삽입하여 설치하는 단계; (d) PC 기둥의 각형강관의 내부로 콘크리트를 타설하여 기둥 설치용 홀의 하단부에서 일정 높이까지 임시기초를 형성하도록 하는 단계; (e) 슬러리월과 PC 기둥에 보 및 슬래브를 설치하여, 1층 바닥판 구조를 형성하는 단계; (f) 각형강관의 내부에 콘크리트를 충전하고 지상층의 상부 골조 공사를 진행하는 동시에, 지하층 부분을 일정 깊이로 굴착하고 슬러리월과 기둥에 보 및 슬래브를 설치하여 바닥판을 형성하는 단계를 반복하여 기초 저면까지 공사를 수행하는 단계;를 포함하여 이루어진다.
Bibliography:Application Number: KR20170108026