construction method of Semi-submissible type platform
The present invention provides a construction method of a marine structure. The construction method of the marine structure includes: a step of being loaded on a working area of a ground workplace in which a marine crane is able to be approached from a mega block of the marine structure using the ma...
Saved in:
Main Authors | , , , , |
---|---|
Format | Patent |
Language | English Korean |
Published |
09.01.2019
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The present invention provides a construction method of a marine structure. The construction method of the marine structure includes: a step of being loaded on a working area of a ground workplace in which a marine crane is able to be approached from a mega block of the marine structure using the marine crane to be installed farthest from a pier; a step of moving a pre-loaded mega block to an inoperable area of the ground workplace where the marine crane isn′t accessible so that the marine crane can load the next mega block onto the work area; a step of loading the next mega block which is going to be connected with the pre-loaded mega block using the marine crane onto the working area.
본 발명은 해상 구조물 건조 방법을 제공한다. 본 발명의 해상 구조물 건조 방법은 해상 크레인을 이용하여 안벽에서 가장 멀리 설치되어야 하는 해상 구조물의 메가블록부터 상기 해상 크레인이 접근 가능한 육상 작업장의 작업 영역에 탑재하는 단계; 탑재가 완료된 선 탑재 메가블록은 상기 해상 크레인이 상기 작업 영역에 다음 메가블록을 탑재할 수 있도록 상기 선 탑재 메가블록을 해상 크레인이 접근하지 못하는 상기 육상 작업장의 작업 불가 영역으로 이동시키는 단계; 및 상기 해상 크레인을 이용하여 상기 선 탑재된 메가블록과 연결될 다음 메가블록을 상기 작업 영역에 탑재하는 단계를 포함할 수 있다. |
---|---|
Bibliography: | Application Number: KR20170083655 |