METHOD OF CONTROLLING AN OIL AMOUNT OF A CONSTRUCTION MACHINE AND SYSTEM FOR PERFORMING THE SAME

According to a method for controlling a flow rate of construction equipment, a rotation position of at least one machine among machines including a boom, an arm, and attachment of construction equipment can be detected. Moreover, it can be determined whether or not a rotation position of the detecte...

Full description

Saved in:
Bibliographic Details
Main Authors JEONG, HEE JUN, YUN, HONG CHEOL
Format Patent
LanguageEnglish
Korean
Published 16.10.2018
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:According to a method for controlling a flow rate of construction equipment, a rotation position of at least one machine among machines including a boom, an arm, and attachment of construction equipment can be detected. Moreover, it can be determined whether or not a rotation position of the detected machine reaches the maximum position. A flow rate supplied to the machine can be blocked when the rotation position of the machine reaches the maximum position. Accordingly, the flow rate supplied to the machine reaching the maximum position is blocked so that the flow rate can be prevented from being wasted. 건설 기계의 유량 제어 방법에 따르면, 건설 기계의 붐, 암 및 어태치먼트를 포함하는 작업기들 중에서 적어도 하나의 작업기의 회전 위치를 감지할 수 있다. 상기 감지된 작업기의 회전 위치가 최대 위치에 도달하였는지를 판단할 수 있다. 상기 작업기의 회전 위치가 상기 최대 위치에 도달시, 상기 작업기로 공급되는 유량을 차단할 수 있다. 따라서, 최대 위치에 도달한 작업기로 공급되는 유량이 차단되므로, 유량이 낭비되는 것을 방지할 수 있다.
Bibliography:Application Number: KR20170044905