METHOD OF CONSTRUCTING UPPER STRUCTURE OF BRIDGE WITH CONTROLLING TRAVERSE DEFLECTION AND ATTITUDE OF BEAMS USING CORRECTING BAR AND CORRECTING NUTS AND UPPER STRUCTURE BY THE SAME

The present invention relates to a superstructure of a bridge, and a construction method thereof. The superstructure of a bridge comprises: a plurality of girders including a first girder mounted on a substructure in a state where a first through hole is formed on an abdomen thereof, a second girder...

Full description

Saved in:
Bibliographic Details
Main Authors PYUN JUN HYEONG, PYUN MYUNG CHEOL, PARR, KI WON
Format Patent
LanguageEnglish
Korean
Published 11.05.2018
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The present invention relates to a superstructure of a bridge, and a construction method thereof. The superstructure of a bridge comprises: a plurality of girders including a first girder mounted on a substructure in a state where a first through hole is formed on an abdomen thereof, a second girder mounted on the substructure in a state where a second through hole is formed on an abdomen thereof, and a third girder mounted on the substructure in a state where a third through hole is formed on an abdomen thereof and arranged between the first girder and the second girder; a correction bar penetrating the first, the second, and the third through hole; a correction nut coupled to be supported on the correction bar to push one or more among the first girder, the second girder, and the third girder to correct one or more among lateral displacement and positions of the plurality of girders; and a bottom plate synthesized on a lower side of the girders while one or more among a position and an interval of one or more among the girders are corrected by the correction nut. A fall of a girder for a bridge is suppressed, and lateral displacement and an inclined position of the girder are corrected to exhibit a high load-bearing capacity. 본 발명은 교량의 상부 구조 및 그 시공 방법에 관한 것으로, 복부에 제1관통공이 형성된 상태로 하부 구조상에 거치된 제1거더와, 복부에 제2관통공이 형성된 상태로 하부 구조상에 거치된 제2거더와, 복부에 제3관통공이 형성된 상태로 하부 구조상에 거치되되 상기 제1거더와 상기 제2거더의 사이에 배열된 제3거더를 포함하는 다수의 거더들과; 상기 제1관통공과 상기 제2관통공과 상기 제3관통공을 관통하는 교정 바와; 상기 교정 바에 지지되게 체결되어 조임 위치에 따라 상기 제1거더와 상기 제2거더와 상기 제3거더 중 어느 하나 이상을 밀어내어 상기 다수의 거더의 횡변형 및 자세 중 어느 하나 이상을 교정하는 교정 너트와; 상기 교정 너트에 의해 상기 거더들 중 어느 하나 이상의 자세와 간격 중 어느 하나 이상이 교정된 상태에서 상기 거더의 상측에 합성된 바닥판을; 포함하여, 교량용 거더의 전도를 억제하면서 거더의 횡변형과 기울어진 자세를 교정하여 높은 내하 능력을 발휘하는 교량 상부 구조 및 그 시공 방법을 제공한다.
Bibliography:Application Number: KR20180044694