ARTIFICIAL STRUCTURE INSTALLATION METHOD AT THE SEA BEDS USING BLOCK STRUCTURE FOR INDUCEMENT OF ARTIFICIAL UPWELLING
The Disclosure is a method of installing a submarine artificial structure using a block structure for inducement of artificial upwelling. The method of installing a submarine artificial structure using a block structure for inducement of artificial upwelling includes: a step (S110) of, when submarin...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | English Korean |
Published |
08.05.2015
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The Disclosure is a method of installing a submarine artificial structure using a block structure for inducement of artificial upwelling. The method of installing a submarine artificial structure using a block structure for inducement of artificial upwelling includes: a step (S110) of, when submarine topology is investigated, grasping multiple submarine location coordinates for loading a block structure (200) on the investigated submarine topology and the number of the block structures (200) to be loaded at the multiple submarine location coordinates, a step (S120) of, after performing the first step, installing a DGPS observation module (150) at each surrounding seabed of the submarine topology, at which the artificial submarine structure is formed, a step (S130) of transferring a carrier (110) having a crane (110) for transferring the block structure (200) to the seabed at one of the multiple submarine location coordinates, a step (S140) for loading the block structure (200) at the submarine location coordinate for loading the block structure (200) by using the crane (110), a step (S150) of monitoring a procedure in the fourth step based on information provided from the DGPS observation module (150), and a step (S160) of, when loading of the block structure (200) at one coordinate of the multiple submarine location coordinates is finished, carrying the carrier (110) to another coordinate of the multiple submarine location coordinates and subsequently performing the step of loading the block structure (200) and the step of monitoring the loading procedure.
용승류 유도용 블록구조체로 형성된 인공해저구조물 설치 방법을 개시한다. 상기 용승류 유도용 블록구조체로 형성된 인공해저구조물 설치 방법은 해저지형을 탐색한 후, 탐색된 인공해저지형 상에 상기 블록구조체(200)가 적재될 복수 개의 해저 위치좌표들 및 상기 복수 개의 해저 위치좌표들에 적재될 상기 블록구조체(200)의 수량 등을 파악하는 단계(S110); 제1 단계 이후, 상기 인공해저구조물이 형성되는 상기 해저지형의 주변부 해저면들 각각에 DGPS 관측모듈(150)을 설치하는 단계(S120); 상기 복수 개의 해저 위치좌표들 중 어느 하나의 좌표로 상기 블록구조체(200) 및 상기 블록구조체(200)를 상기 해저면으로 이송시키기 위한 크레인(110)이 구비된 운반선(110)을 이동시키는 단계(S130); 상기 블록구조체(200)가 적재될 상기 해저영역의 위치좌표로 상기 블록구조체(200)를 상기 크레인(110)을 통해 적재하는 단계(S140); 상기 제4 단계 과정을 상기 DGPS 관측모듈(150)에서 제공되는 정보를 모니터링하는 단계(S150); 및 상기 복수 개의 해저 위치좌표들 중 어느 하나의 좌표 상에 상기 블록구조체(200)의 적층 과정이 종료되면, 상기 복수 개의 해저 위치좌표들 중 다른 하나의 좌표로 상기 운반선(110)을 이동한 후, 상기 블록구조체(200) 적재 단계 및 상기 적재과정 모니터링 단계를 순차적으로 수행하는 단계(S160)를 포함한다. |
---|---|
Bibliography: | Application Number: KR20130131407 |