TOP DOWN METHOD AND BUILDING CONSTRUCTION USING THE SAME

A plurality of unit precast concrete (PC) columns manufactured in a unit length is used by being connected in a top down construction method according to the present invention so that the unit PC column is shorter and lighter than a single column corresponding to the depth of an underground construc...

Full description

Saved in:
Bibliographic Details
Main Authors KAWABATA ICHIZO, LEE, JIN SEOP, JUNG, KI RONG, KIM, SUNG HUN
Format Patent
LanguageEnglish
Korean
Published 27.01.2014
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:A plurality of unit precast concrete (PC) columns manufactured in a unit length is used by being connected in a top down construction method according to the present invention so that the unit PC column is shorter and lighter than a single column corresponding to the depth of an underground construction layer. Therefore, the top down construction method can reduce construction costs by reducing a burden of equipment and facilitating transportation. Moreover, a first unit PC column is fixed by a holder after being inserted into a column insertion hole, and the equipment lifts and stands only a second unit PC column so that the burden of the equipment can be reduced.
Bibliography:Application Number: KR20120126688