PROCESSES FOR LEVEE AND RECLAMATION BY CAKING DREDGED SAND

PURPOSE: A method of building an embankment and forming filled land using the solidifying process of dredged soil is provided to reduce construction cost using on-the-spot dredged soil. CONSTITUTION: A method of building an embankment and forming filled land using the solidifying process of dredged...

Full description

Saved in:
Bibliographic Details
Main Authors PARK, SOON JIN, SONG, JAE HEON
Format Patent
LanguageEnglish
Korean
Published 11.02.2011
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:PURPOSE: A method of building an embankment and forming filled land using the solidifying process of dredged soil is provided to reduce construction cost using on-the-spot dredged soil. CONSTITUTION: A method of building an embankment and forming filled land using the solidifying process of dredged soil is as follows. Solidifier-mixed dredged soil is put in a bag(10), which comprises an injection port for discharging dredged soil. The dredged soil containing bags are successively loaded.
Bibliography:Application Number: KR20090072088