PROCESSES FOR LEVEE AND RECLAMATION BY CAKING DREDGED SAND
PURPOSE: A method of building an embankment and forming filled land using the solidifying process of dredged soil is provided to reduce construction cost using on-the-spot dredged soil. CONSTITUTION: A method of building an embankment and forming filled land using the solidifying process of dredged...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | English Korean |
Published |
11.02.2011
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PURPOSE: A method of building an embankment and forming filled land using the solidifying process of dredged soil is provided to reduce construction cost using on-the-spot dredged soil. CONSTITUTION: A method of building an embankment and forming filled land using the solidifying process of dredged soil is as follows. Solidifier-mixed dredged soil is put in a bag(10), which comprises an injection port for discharging dredged soil. The dredged soil containing bags are successively loaded. |
---|---|
Bibliography: | Application Number: KR20090072088 |