LONG PIPELINE CONSTRUCTION METHOD

The present invention relates to a method of constructing a long pipeline, which is no less than 8 meters in length, in excavated ground in regard to a pipeline such as water/sewage pipes, a gas pipe or the like. The method includes the following steps of: dropping a plurality of adjacent spread bea...

Full description

Saved in:
Bibliographic Details
Main Author AN, YOUNG HO
Format Patent
LanguageEnglish
Korean
Published 17.02.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The present invention relates to a method of constructing a long pipeline, which is no less than 8 meters in length, in excavated ground in regard to a pipeline such as water/sewage pipes, a gas pipe or the like. The method includes the following steps of: dropping a plurality of adjacent spread beams; dropping a long pipeline to place the pipeline on the plurality of spread beams; installing a plurality of lifting mechanisms, which have rollers formed in an upper end part thereof to support the long pipeline at a predetermined height, between a plurality of non-dropped spread beams adjacent to the plurality of dropped spread beams; moving the long pipeline horizontally such that the long pipeline can be supported by each of the upper end rollers of the plurality of lifting mechanisms, thereby locating the long pipeline between the plurality of non-dropped spread beams; dropping the long pipeline by driving the plurality of lifting mechanisms; and removing the plurality of lifting mechanisms. Therefore, since the long pipeline can be constructed without the removal of the spread beams, the collapse of a side wall due to the removal of the spread beams can be prevented, which can result in safe construction. 본 발명은, 상하수도관, 가스관 등의 관로를 굴착된 지반에 길이가 8미터 이상인 장대관을 시공하는 방법에 관한 것으로서, 이웃하는 복수의 버팀보를 하강시키는 단계와; 장대관을 하강시켜 상기 복수의 버팀보 상에 안착시키는 단계와; 상기 장대관을 일정한 높이로 지지하기 위한 롤러가 상단부에 형성된 복수의 승하강 이송장치를 상기 하강된 복수의 버팀보와 이웃한, 하강하지 않은 복수의 버팀보의 사이에 설치하는 단계와; 상기 장대관을 수평으로 이동시켜 상기 복수의 승하강 이송장치의 각 상단부 롤러에 의해 지지되도록 함으로써 상기 하강하지 않은 복수의 버팀보 사이에 위치시키는 단계와; 상기 복수의 승하강 이송장치를 구동시켜 상기 장대관을 하강시키는 단계; 및 상기 복수의 승하강 이송장치를 제거하는 단계를 포함하는 것을 특징으로 한다. 이에 의하면, 버팀보를 제거하지 않고도 장대관을 시공할 수 있으므로 상기 버팀보 제거로 인한 측벽의 붕괴 염려가 없어 안전한 시공을 달성할 수 있다.
Bibliography:Application Number: KR20200117479