Retaining wall construction method for not required wall finishing and mold
According to the present invention, provided is a retaining wall construction method eliminating the need for a mold and wall-finishing, capable of being very useful for a place, which takes earth pressure, and significantly lowering construction costs and shortening periods for construction by enab...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | English Korean |
Published |
15.01.2020
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | According to the present invention, provided is a retaining wall construction method eliminating the need for a mold and wall-finishing, capable of being very useful for a place, which takes earth pressure, and significantly lowering construction costs and shortening periods for construction by enabling construction without wall rebar replacement, a wall mold and wall-finishing. According to an advisable embodiment of the present invention, the retaining wall construction method includes the following steps of: installing a foundation mold on the floor of the foundation ground, in which a retaining wall is expected to be constructed, and then, placing foundation rebars; erecting unit wall panels or unit wall modules where the foundation rebars are placed, one by one in a longitudinal direction of the retaining wall while connecting adjacent unit wall panels with each other; placing foundation concrete in the foundation mold, and sequentially placing wall concrete in the unit wall panels or unit wall modules, and then, curing the concrete; and removing the foundation mold, and then, backfilling the site.
본 발명은 벽체 철근 배근, 벽체 거푸집 및 벽체 마감이 없이 시공되어져 공기가 단축되고 시공비용이 대폭 저감될 수 있고, 더욱이 작은 토압을 받는 곳에 매우 유용토록 한 벽체 마감 및 거푸집이 불필요한 옹벽의 시공 방법을 제공한다. 본 발명의 적절한 실시 형태에 따른 벽체 마감 및 거푸집이 불필요한 옹벽의 시공 방법은, 옹벽이 시공될 기초지반의 바닥에 기초거푸집을 설치한 후 기초 철근을 배근하는 단계와; 기초 철근이 배근되어 있는 곳에 단위벽체패널 또는 단위벽체모듈을 옹벽의 길이방향으로 하나씩 나란하게 세워가면서 인접한 단위벽체패널을 서로 연결시켜 놓는 단계와; 기초거푸집에는 기초콘크리트를 타설하고, 단위벽체패널 또는 단위벽체모듈에는 벽체콘크리트를 순차적으로 타설한 후 양생하는 단계와; 기초거푸집을 제거한 후 되메우기를 실시하는 단계;를 포함하여 시공되는 것을 특징으로 한다. |
---|---|
Bibliography: | Application Number: KR20190057167 |