A method of preventing sinking of the ground through grouting of the scour part outside the pipe
The present invention provides a method to prevent sinking of the ground through grouting of a scour part outside a pipe, capable of easily stabilizing the ground. According to the present invention, the method prevent sinking of the ground through grouting of a scour part outside a pipe comprises a...
Saved in:
Main Authors | , , , , |
---|---|
Format | Patent |
Language | English Korean |
Published |
30.01.2019
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The present invention provides a method to prevent sinking of the ground through grouting of a scour part outside a pipe, capable of easily stabilizing the ground. According to the present invention, the method prevent sinking of the ground through grouting of a scour part outside a pipe comprises a packer insertion step, a packer air injection step, a first grouting step, a second grouting step, and a packer removing step.
본 발명은 관로 외측 세굴부분의 그라우팅을 통한 지반의 함몰방지 공법에 관한 것으로, 관로의 내측에서 관로의 손상부분을 통해 관로 외측의 지반의 세굴부분으로 그라우트를 실시하되, 1차 그라우트재를 먼저 주입하여 세굴부분이 큰 부분을 안정화 시킨 후 상기 1차 그라우트재보다 상대적으로 작은 입자를 갖는 2차 그라우트재를 주입하여 세굴부분이 작은 부분으로도 그라우트재가 주입되도록 하여 차수 및 밀폐 효율이 향상되도록 함으로써 지반의 안정화가 용이하게 이루어지도록 하는 관로 외측 세굴부분의 그라우팅을 통한 지반의 함몰방지 공법을 제공함에 있다.상기 목적 달성을 위한 본 발명은, 관로의 내부로 팩커를 삽입하여 관로 내부에 형성되어 있는 손상부분으로 이동시키는 팩커 투입단계; 이후 팩커의 내부로 공기를 주입하여 팩커가 팽창되도록 함으로써 상기 손상부분의 주변을 밀폐시키는 팩커 공기주입단계; 이후 팩커를 통해 상기 관로의 손상부분으로 유·무기계 현탁액으로 이루어진 1차 그라우트재를 주입하여 관로의 외측에 형성된 세굴부분에 1차 그라우트재가 주입되도록 함으로써 세굴부분을 1차적으로 밀폐하여 안정화시키는 1차 그라우트단계; 이후 상기 1차 그라우트재 보다 상대적으로 점도가 낮고 주제와 경화제로 이루어진 2액형 유기계 약액으로 이루어진 2차 그라우트재를 관로의 손상부분으로 주입하여 관로의 외측에 형성된 세굴부분에서 1차 그라우트재가 주입되지 못한 미세한 공극으로 주입되도록 하는 2차 그라우트단계; 이후 1,2차 그라우트재가 경화되면 상기 팩커를 관로의 외부로 제거하는 팩커 제거단계;를 포함하여 구성된 것을 기술적 요지로 한다. |
---|---|
Bibliography: | Application Number: KR20180012193 |