ASSET MANAGEMENT METHOD FOR SUBSTATION

According to the present invention, an asset management method for substation comprises the steps of: comparing the reliability of a reference reliability model for each substation model with soundness index for each substation device generated on the basis of state data for each substation device a...

Full description

Saved in:
Bibliographic Details
Main Authors JUNG, JAE RYONG, LYU, EUN TAE, SEO, HWANG DONG
Format Patent
LanguageEnglish
Korean
Published 10.10.2018
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:According to the present invention, an asset management method for substation comprises the steps of: comparing the reliability of a reference reliability model for each substation model with soundness index for each substation device generated on the basis of state data for each substation device and real-time monitoring information to determine whether to correct a reliability model for each substation device; correcting the reference reliability model for each substation model by using the soundness index for each substation device according to the determination result, and generating a unique reliability model for each substation device; estimating a systematic reliability index and economics for each maintenance scenario on the basis of a reference system reliability model previously generated for candidate devices to be maintained among the substation devices; and selecting a maintenance scenario for each candidate device to be maintained according to the soundness index for each substation device, the unique reliability model for each substation device, and a result of estimation of the systematic reliability index and economics, confirming whether to perform maintenance, and then updating the unique reliability model for each substation device according to a result of the maintenance. The reference reliability model for each substation model is generated based on the power plant basic information and the failure history information. The reference reliability model for each substation model is generated on the basis of base information and failure history information of power utilities, and the reference reliability model for each substation model is generated by extracting failure data on the basis of the base information and the failure history information of the power utilities, dividing the failure data before and after the optimum reference time, generating reliability models for respective data sets, estimating shape parameters and scale parameters, and deriving a hybrid model in which the reliability models of the respective data sets are synthesized. 본 발명에 따른 변전소의 자산 관리 방법은, 변전소 기종 별 기준 신뢰도 모델의 신뢰도 및 변전소 기기 별 상태 데이터와 실시간 모니터링 정보를 기초로 생성된 변전소 기기 별 건전도를 비교하여, 변전소 기기 별 신뢰도 모델의 보상 여부를 판단하는 단계; 상기 판단 결과에 따라 상기 변전소 기기 별 건전도를 이용하여 상기 변전소 기종 별 기준 신뢰도 모델을 보상하고 변전소 기기 별 고유 신뢰도 모델을 생성하는 단계; 상기 변전소 기기 중 유지보수 대상 후보 기기에 대해서 미리 생성된 기준 계통 신뢰도 모델을 기초로 유지보수 시나리오 별 계통 신뢰도 지수 및 경제성 평가를 수행하는 단계; 상기 변전소 기기 별 건전도, 상기 변전소 기기 별 고유 신뢰도 모델, 상기 계통 신뢰도 지수 및 경제성 평가의 결과에 따라 상기 유지보수 대상 후보 기기 별 유지보수 시나리오를 선정한 후 유지보수의 실행 여부를 확인하여, 상기 유지보수의 수행 결과에 따라 상기 변전소 기기 별 고유 신뢰도 모델을 갱신하는 단계;를 포함하고, 상기 변전소 기종 별 기준 신뢰도 모델은 전력설비 기본정보 및 고장이력 정보를 토대로 생성하고, 상기 변전소 기종 별 기준 신뢰도 모델은 상기 전력 설비 기본 정보 및 고장 이력 정보를 토대로 고장 데이터를 추출하고, 최적 기준 시점 전후로 상기 고장 데이터를 분할하며, 각 데이터 세트에 대해서 신뢰도 모델을 생성하고 형상모수와 척도모수를 추정한 후, 상기 각 데이터 세트의 신뢰도 모델을 합성한 혼합 모델을 도출함으로써 생성된다.
Bibliography:Application Number: KR20170055656