SYSTEM AND METHOD FOR TUNNEL BIM SIMMULATION USING TUNNEL CONSTRUCTION DATA AND TUNNEL FACE XML DATA

Disclosed is a tunnel BIM simulation system and method based on tunnel design data and tunnel face XML data. The purpose of the present invention is to provide a system and method, enabling a user to intuitively analyze, and easily manage and utilize tunnel construction-related data such as tunnel d...

Full description

Saved in:
Bibliographic Details
Main Authors YOO, WAN KYU, KIM, CHANG YONG, ZHENG XIU MEI, KIM, JEONG HEUM
Format Patent
LanguageEnglish
Korean
Published 05.09.2016
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Disclosed is a tunnel BIM simulation system and method based on tunnel design data and tunnel face XML data. The purpose of the present invention is to provide a system and method, enabling a user to intuitively analyze, and easily manage and utilize tunnel construction-related data such as tunnel design data and site data. The tunnel BIM simulation system includes a two-dimensional central alignment data generating unit, a three-dimensional central alignment data generating unit, a tunnel cross section shape setting unit, a BIM model generating unit, and a tunnel face data setting unit. The two-dimensional central alignment data generating unit generates horizontal alignment data and vertical alignment data of a tunnel from tunnel design data, the three-dimensional central alignment data generating unit generates three-dimensional central alignment data of the tunnel from the horizontal alignment data and the vertical alignment data, the tunnel cross section shape setting unit sets a cross section shape of the tunnel by section from the tunnel design data, the BIM model generating unit generates a three-dimensional BIM model of the tunnel by using the three-dimensional central alignment data of the tunnel and the cross section shape of the tunnel by section, and the tunnel face data setting unit sets a cross section of a corresponding three-dimensional BIM model of the tunnel to tunnel face data of the tunnel. 터널 설계 데이터와 굴진면 데이터를 기반한 터널 BIM 시뮬레이션 시스템 및 방법이 개시된다. 터널 BIM 시뮬레이션 시스템은, 2차원 중심 선형 데이터 생성부, 3차원 중심 선형 데이터 생성부, 터널 횡단면 형태 설정부, BIM 모델 생성부, 굴진면 데이터 설정부를 포함한다. 2차원 중심 선형 데이터 생성부는 터널의 설계 데이터로부터 터널의 평면 선형 데이터 및 종단 선형 데이터를 생성하고, 3차원 중심 선형 데이터 생성부는 평면 선형 데이터와 종단 선형 데이터로부터 터널의 3차원 중심선형 데이터를 생성하고, 터널 횡단면 형태 설정부는 터널의 설계 데이터로부터 터널의 구간별 횡단면 형태를 설정하고, BIM 모델 생성부는 터널의 3차원 중심 선형 데이터와 터널의 구간별 횡단면 형태를 이용하여 터널의 3차원 BIM 모델을 생성하며, 굴진면 데이터 설정부는 터널의 굴진면 데이터를 대응하는 터널의 3차원 BIM 모델상의 단면에 대해 설정한다.
Bibliography:Application Number: KR20150105738