ECO-FRIENDLY IN-SITU SHORE PROTECTION AND PAVE CONSTRUCTION METHOD USING POROUS STRUCTURE AND FORMER

PURPOSE: An environmentally-friendly in-situ shore protection and pavement method using a permeable body and a former is provided to improve construction performance by installing a former on the ground and integrally installing a permeable body between pocket units of the former. CONSTITUTION: An e...

Full description

Saved in:
Bibliographic Details
Main Authors KIM, KI JUNG, SHIN, SEUNG KYO, PARK, SEONG YONG, LEE, SANG KEUN, JANG, SUK HWAN, HUR, HYUNG WOO, PARK, JONG SIK, OH, MIN HO
Format Patent
LanguageEnglish
Korean
Published 06.03.2012
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:PURPOSE: An environmentally-friendly in-situ shore protection and pavement method using a permeable body and a former is provided to improve construction performance by installing a former on the ground and integrally installing a permeable body between pocket units of the former. CONSTITUTION: An environmentally-friendly in-situ shore protection and pavement method using a permeable body and a former is as follows. A former is installed on the top of a cut surface. The former is composed of supports and pocket units. Permeable bodies(200) are installed between the pocket units. The covers of the pocket units are removed. Soil mixed with plant seeds is spread on the top of the permeable bodies and the pocket units. Trees and plants(400) are planted in the inner spaces of the pocket units, in which the covers are removed. The inner spaces of the pocket units are filled with permeable filler(300). Plant seeds or soil mixed with the plant seeds are spread on the top of the permeable bodies.
Bibliography:Application Number: KR20110059701