CONSTRUCTION METHOD FOR PERPENDICULAR HALL USING PIPE
PURPOSE: A construction method for a perpendicular hall using a pipe is provided to reduce time and cost for construction. CONSTITUTION: A lower pipe is arranged on the top surface of a ground(1) in which an upper opened part of a vertical shaft is positioned on one of pipes. The bottom side of the...
Saved in:
Main Author | |
---|---|
Format | Patent |
Language | English Korean |
Published |
12.11.2009
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PURPOSE: A construction method for a perpendicular hall using a pipe is provided to reduce time and cost for construction. CONSTITUTION: A lower pipe is arranged on the top surface of a ground(1) in which an upper opened part of a vertical shaft is positioned on one of pipes. The bottom side of the other ground(1a) is excavated through the inside of the lower pipe and the lower pipe is sunk downward. A central pipe is connected to the upper end of the lower pipe. |
---|---|
Bibliography: | Application Number: KR20090019706 |