METHOD AND APPARATUS FOR LEVELING RUBBLE IN WATER BY MOUND LEVELLING
PURPOSE:To build up a rubble-mound with improved leveling accuracy and with good efficiency by a method in which small-size stones are partly removed out of large and small-size stones in a stone-housing chamber, large and small- size stones are discharged from the front side and stacked, and small-...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | English |
Published |
28.10.1986
|
Edition | 4 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PURPOSE:To build up a rubble-mound with improved leveling accuracy and with good efficiency by a method in which small-size stones are partly removed out of large and small-size stones in a stone-housing chamber, large and small- size stones are discharged from the front side and stacked, and small-size stones alone are discharged from the back side. CONSTITUTION:When large and small-size stones are charged from a supply port 2 into a stone-housing chamber 4, small-size stones (b) are partly discharged and dropped through a classifier 5. A rubble leveler is horizontally moved by a mover and the small-size stones (b) are stored in the back side 4b of the stone-housing chamber, Large-and small-size stones are discharged from the front side 3b of a stone charging port and stacked and leveled to a given level L by the lower end of the classifier 5. When a great recession(c) is formed, the small-size stones (b) are charged into the recession (c). Since the needs for leveling operations for the rubble-mound are eliminated, operational efficiency and the leveling accuracy can thus be greatly enhanced. |
---|---|
Bibliography: | Application Number: JP19850081393 |