REPAIRING REINFORCEMENT CONSTRUCTION METHOD OF CONCRETE STRUCTURE
PROBLEM TO BE SOLVED: To visually confirm a mortar filling condition from outside at work when mortar is invertedly placed on an increased concrete wall or the like. SOLUTION: A concrete wall 4 or a brace is installed or constructed among a floor 1, a column 2 and a beam 3 or an existing wall of a r...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | English |
Published |
16.02.1999
|
Edition | 6 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | PROBLEM TO BE SOLVED: To visually confirm a mortar filling condition from outside at work when mortar is invertedly placed on an increased concrete wall or the like. SOLUTION: A concrete wall 4 or a brace is installed or constructed among a floor 1, a column 2 and a beam 3 or an existing wall of a reinforced concrete building or the like in a condition of not directly contacting one or four sides with them. Next, a porous sheet 6 having pores in a degree of holding an interval in the almost same as a thickness of the concrete wall 4 or the like or slightly thinner than that and of hardly flowing out internally injected mortar before curing, is arranged in a noncontact part, and mortar is filled in a space formed between porous sheets 6. |
---|---|
Bibliography: | Application Number: JP19970216989 |