METHOD AND SYSTEM FOR SCHEDULE MANAGEMENT AND MEDIUM HAVING RECORDED SCHEDULE MANAGEMENT PROGRAM

PROBLEM TO BE SOLVED: To perform a flexible schedule management by taking additional attributes of events into consideration. SOLUTION: In this schedule management method performing schedule adjustment among users in the group consisting of plural users for every time slot as certain-time unit, if t...

Full description

Saved in:
Bibliographic Details
Main Authors NIWANO EIICHI, SHINOHARA AKIO, SHIROTANI TAKASHI, TAKEISHI EIJI
Format Patent
LanguageEnglish
Published 27.08.1999
Edition6
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:PROBLEM TO BE SOLVED: To perform a flexible schedule management by taking additional attributes of events into consideration. SOLUTION: In this schedule management method performing schedule adjustment among users in the group consisting of plural users for every time slot as certain-time unit, if there are existing events (step 41), the priority level of a newly proposed event against the existing events is calculated based on various attribute values (step 43), and a realization possibility of the proposed event is calculated based on respective priority levels of pertinent existing events of individual users (step 44), and this proposed event is proposed at a time slot where the realization possibility is highest.
Bibliography:Application Number: JP19980031167